Trade guide

Electrical

Outlets, switches, lighting, panels, EV chargers and rewiring. This is life-safety work - it should be done by a licensed electrician and inspected.

Checkmarks are saved only in this browser.

What the work involves

  • Assessing the panel's capacity and existing wiring
  • Running new circuits and boxes
  • Installing devices, fixtures and required protection (GFCI/AFCI)
  • Panel upgrades and utility coordination
  • Testing and labeling circuits

What should happen, step by step

Use this as a checklist while the job is underway. If a step is skipped, ask why.

Durations are typical planning ranges from Corky's field experience, not guarantees. Weather, inspections, material lead times and surprises behind walls change them.

How long it usually takes

Small device work is often a few hours to a day. Panel upgrades often take a day of work plus scheduling with the utility and inspector. Whole-house rewires can take a week or more plus drywall repair.

Plan your dates with the Project Timeline Planner

General guidance only. Your contractor's written schedule is what counts.

Inspections to expect

  • Electrical rough-in inspection
  • Service/panel inspection and utility release for upgrades
  • Final electrical inspection

Which inspections apply depends on your city or county. Ask your contractor to share each passed inspection result. Understanding permits & inspections

What a good bid includes

Check off each item on the bids you receive:

How to read a bid · Have one in hand? Second Look Review (from $25)

Payment schedule

Deposit, payment after rough inspection passes, balance after final inspection.

  • Pay a modest deposit, then progress payments tied to finished, visible milestones (e.g., 'rough-in passed inspection'), never to dates alone.
  • Keep payments at or behind the work completed - you should never have paid for much more than has been done and delivered.
  • Hold the final payment until the final inspection is passed, the punch list is finished and you have lien waivers.
  • Avoid cash. Pay by check or card so there is a record, and get a receipt for every payment.
  • Deposit limits vary by state: California, for example, caps a home improvement down payment at 10% of the price or $1,000, whichever is less. Arizona has no single statewide percentage cap that we are aware of, so negotiate it and put it in the contract. Check your state's rules.

Payment schedules & lien waivers

Red flags & common rip-offs

  • Unlicensed 'handyman' electrical work
  • Skipping permits and inspections
  • No load calculation before adding big loads like EV chargers or heat pumps
  • Double-tapped breakers or no labeling
  • Pressure to replace a whole panel with no explanation
  • Asking you to pull an owner-builder permit for their work
  • Open walls closed before rough inspection

Also watch for the general warning signs: large upfront payments, cash-only, no written estimate, pressure to sign today and no proof of license or insurance.

Questions to ask before you sign

  1. Are you a licensed electrician, and who pulls the permit?
  2. Does my panel have capacity for this?
  3. What code upgrades will this trigger?
  4. Is drywall patching included?
  5. Will you label the panel?
  6. Will you give me a copy of the passed inspection?
  7. Which circuits get GFCI/AFCI protection under the code used here?

Get the answers in writing, in the contract. Always ask for the contractor's license number and proof of insurance, and check the license with your state or local licensing agency. How to hire a contractor · Quick question? Contractor's Desk ($5)

Warranty

Ask for a workmanship warranty; devices and fixtures carry manufacturer warranties.

Expect two kinds of warranty: the manufacturer's product warranty (shingles, windows, fixtures, equipment) and the contractor's workmanship warranty on the installation. Get both in writing with the length, what is covered and how to make a claim. Many product warranties require registration or installation per the manufacturer's instructions. In Arizona, a homeowner can file a workmanship complaint against a licensed contractor with the Registrar of Contractors within two years of the last work performed on a remodel or repair.

DIY vs. hire out

Usually OK to DIY

  • Changing light bulbs, resetting breakers, testing GFCIs monthly
  • Replacing a plug-in device

Hire a licensed pro

  • Anything wired - circuits, panels, fixtures, EV chargers. Many places require a license and permit; it's also a fire and shock hazard.

Some work legally requires a licensed contractor and a permit even on your own home. Check your state and city rules.

Permits to expect

Most electrical work beyond replacing a like-for-like device needs a permit and inspection in most areas. Permit rules are set by your city, county and state, so they vary a lot. Call or check the website of your local building department before work starts. When a permit is required, the licensed contractor usually pulls it in their own name.

General information, not legal advice. Requirements vary by location.

Sources

Check a contractor license: search your state's contractor licensing board, or find your state consumer protection office. External sites open in a new tab; Corky's MHS™ is not affiliated with them.

Please note

Educational information only - not legal, engineering or code advice. Rules vary by state, county and city, and change over time. Check with your local building department and licensing board, and read your own contract.